国产成人精品综合久久久久性色,继母的拖油瓶是我的前女友动漫,欧美精品乱码99久久蜜桃,精品国产自在天天线2019

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤,施工人員應(yīng)踏在底盤的加強(qiáng)筋上,在安裝塔外殼、底盤等纖維件時(shí),為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹(shù)脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場(chǎng)合,須安裝在通風(fēng)良好的場(chǎng)所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
秋霞影视欧美高清av片| 蜜桃av色偷偷av老熟女| 巨胸不知火舞露双奶头无遮挡| 极大满足求知欲的视频| 国产精品水嫩水嫩| 苍井空在线av播放| 国产精品天天看天天做夜夜爽 | 无翼鸟邪恶少女漫画| 国产av国片偷人妻麻豆| freexxx性欧美| 四虎成人精品国产永久免费无码| 精品免费AV一区二区三区| 国产成人免费ā片在线观看 | (无码视频)在线观看| 激情五月综合色婷婷一区二区| 色喜国模私密浓毛私拍人体图片| 边做饭边被躁我和邻居的视频| 啦啦啦在线视频免费观看| 偷玩熟睡醉酒体育壮男gv| 浪荡货老子大吗爽死你h漫画男男| 久久偷看各类wc女厕嘘嘘偷窃| 风韵诱人的岳欲仙欲死在线观看| 午夜精品一区二区三区免费视频| 年轻老师2韩国手机在线| 护士故意露出奶头让我吃奶| 国产免费一区二区三区免费视频| 久久亚洲国产精品五月天婷| 国产做A爱片久久毛片A片| 白丝jk校花娇喘求饶白浆露出| 韩国理伦三级做爰观看玩物 | 久久久久亚洲AV片无码下载蜜桃| 又白又肥的农村大肥臀老熟妇| 无码专区aaaaaa免费视频| 师尊被掐着腰做到潮喷纯肉gb| 韩国漫画漫免费观看免费| 7777精品久久久大香线蕉| 亚洲中文久久精品无码ww16| 丰满少妇三级全黄| 国产在线拍揄自揄拍免费下载| 人妻日本无中文字幕无码| 久久久噜噜噜久久熟女aa片|